Construction and construction industry-affiliated business consignment Print this page

The last update date:
May 25, 2020
We will tell about construction and correspondence for prevention of infection spread of new coronavirus infectious disease in construction industry-affiliated business consignment.
Notice sentence
Style (reference)

When it is done the next agency by bids, please use public transport.

If "management scales receive evaluation result, general rating scale value notification" by management matter examination as for the bid participation qualified person of construction after jushin (every financial statements jushin), please submit copying of notification to Contract Division by all means.
※When you are going to undertake public construction from owner directly, you must receive "management matter examination" by all means.

Please perform "user registration" on e-bidding system immediately if you receive "report of use of system receptionist vote" of e-bidding.

About tender notice, result, please confirm by auction information service (PPI).

About tender notice, result of specific procurement agreement, it is this

Shizuoka-shi e-bidding portal site

Update information

R2.5.25 Notification (please see auction information service (PPI) about the details.) of open bid
R2.4.17 Bid contract systems about 2020 construction called off published material of briefing session.
 → This
R2.4.1 We should cancel briefing sessions such as bid contract systems about Shizuoka-shi construction for extended prevention of new coronavirus infectious disease in 2020. Only briefing session material is going to be released in Contract Division homepage in the middle of April.
R2.4.1 We published bid participation qualification authorized person pertaining to construction industry-affiliated business consignment of 2020, 2021. → This
R2.4.1 We published ordering prospect (as of April 1) of construction of 2020 and construction industry-affiliated business consignment.
R2.4.1 We opened revised summary of bid, contract system to the public in 2020 → This
R2.3.18 We published guide for Shizuoka-shi global assessment method restrictions open bid conduct belonging to in 2020.
Point addition end-point "town development that resists disaster" of building complete set construction in 2020 global assessment method
We published nitsuiteo. ⇒ The details are this
R2.3.5 We published special measures accompanied with rise in labor unit price to apply from March, 2020.
 ⇒ Please see "announcement" of this page lower berth.
R2.3.5 We published operation of inflation slide of construction accompanied with rise in labor unit price to apply from March, 2020. ⇒ Please see "announcement" of this page lower berth.
R2.1.31 About rule revision accompanied with civil law revisions, we carry out civic opinion open call for participants.
・About partial revision of Shizuoka-shi contract rule     ⇒ The details are this
・⇒ details are this about partial revision of Shizuoka-shi construction execution rule
R2.1.29 We canceled the following bids.
・reiwagennendosuidokan*aratamedai 13 Kashio, Shimizu-ku water pipe installation spare construction (bid number: 23099)
R1.11.5 We published bid participation qualification authorized person pertaining to construction of origin of Reiwa, 2002. → This
R1.11.5 We updated person of qualifications bid participation authorization pertaining to construction industry-related duties in Heisei 30, 2019. → This
R1.10.1 We opened ordering prospect of construction of the second half of the year and construction industry-affiliated business consignment to the public in 2019.
R1.6.7 ⇒ details changing calculation type such as the minimum limit prices from July 1, 2019 are this
H31.4.17 We uploaded material of briefing session about bid contract system about construction in 2019. → This
H31.4.4 We published rubric that it revised in 2019. → Please see collection of official regulations, styles of the lower berth.
H31.4.2 In 2019, we published bid participation qualification authorization person pertaining to construction of 2020. → This
H31.4.1 We published ordering prospect (as of April 1) of construction open bid of 2019.
H31.4.1 We opened revised summary of bid, contract system to the public in 2019 → This
H30.11.19 It revised "qualifications that were necessary for competitive bidding participant pertaining to consignment contract of contract of construction that Shizuoka-shi ordered and construction industry-related duties". → Please see "about official regulations about contract" of "collection of official regulations, styles".
H30.10.1 We published ordering prospect (as of October 1) of construction of 2018 and construction industry-affiliated business consignment open bid.
H30.4.2 As the number of the figures of the other party number changed from 2018, please be careful. → This

We are going to bid

Bid (estimate) result

Ordering has a possibility

□Construction ordering has a possibility
□Construction industry-related business consignment ordering has a possibility

(note) this prospect gathered construction that ordering is anticipated and construction industry-affiliated business consignment as of April 1, 2020, and, at contract method, bid time, may change summaries.
  
□Construction ordering such as state organ, each prefecture, municipality of the Chubu District has a possibility

Preliminary screening of prospective bidders application

 Under application acceptance occasional in origin of construction Reiwa, 2002

Under application acceptance occasional in  construction industry-related business consignment 2020, 2021


 Change-related format (construction and construction industry-affiliated business consignment) of bid participation qualification application contents
 ※When account information that is reported to Shizuoka-shi has change, please ask Shizuoka Accounting Division (contact information: 054-221-1164).

Collection of official regulations, styles

Open bid [construction] with global assessment method restrictions

Conduct method of global assessment method restrictions open bid belonging to 
  ※We published guide (2020 revised edition) for global assessment method restrictions open bid conduct belonging to.

About point addition end-point "town development (proportion of the number of the licensees of damaged building emergency degree of risk judgment person) resisting disaster"
 ※We published material of 2020.

※Because "the results of volunteer activity" were not end-point, submission of activity report becomes needless.

Revision of bid contract system pertaining to contract such as construction

About bid participation stop measures

Briefing sessions such as bid contract systems

Briefing sessions such as bid contract systems about Shizuoka-shi construction were called off for extended prevention of new coronavirus infectious disease in 2020. As you published briefing session material which you were going to distribute, please confirm.

 [briefing session material] that we can confirm materials from this

Notice

About conduct of special measures accompanied with rise in labor unit price to apply from March, 2020 
 ⇒  As for the bills, it is style ・Construction  ・Construction industry-affiliated business consignment  ・Other trust
    Reference materials     Notice of Ministry of Land, Infrastructure, Transport and Tourism (plan No. 50 with national domain dated February 14, 2020) 

About operation of inflation slide in construction (apply to rise in labor unit price to apply from March, 2020)
 ⇒  ・Operational manual, request style   

About conduct of civic opinion open call for participants pertaining to partial revision of 2019 Shizuoka-shi contract rule
  [(offer period from January 31, 2020 to March 2, 2020) when opinion offer was finished]
About conduct of civic opinion open call for participants pertaining to partial revision of 2019 Shizuoka-shi construction execution rule
  [(offer period from January 31, 2020 to March 2, 2020) when opinion offer was finished]
About calculation type such as the minimum limit prices (July 1, 2019 ...)

About thorough social insurance participation in construction industry

About utilization of the city supplier in subcontract

About procedure accompanied with the enforcement for law (2014 law No. 92) to revise a part of the authorized architect method → Style is this

About the handling of the stamp duty of document pertaining to contract

About result of opinion open call for participants procedure pertaining to partial revision for Shizuoka-shi construction execution rule [2018 conduct]

Others

Questionnaire about this page

In this page, was it easy to use?

Reference about this page

2 Local Finance Bureau Finance Department Contract Division construction contract first people in charge

The location: Shizuoka government building the tenth floor of the new building

Telephone: 054-221-1027

Fax: 054-221-1028

Inquiry Form